Fischer machine revision

SPECIFICATIONS

As a result of the machine inspection and the interview with the Kolsan technical team, a maintenance plan was prepared within the framework of the following items
  • Dismantling of the guillotine section of the existing machine and modification of the bearing group
    Removing the construction in the region by placing a linear guideway and making removable fasteners
    Side eccentric arm conversion from bronze to ball bearing
    Supply and installation of special roller load bearings
    Manufacture and assembly of bearing connection special design wedges
    Modification and renewal of blade connection plate threads
    Reconditioning of under-blade belt bearings
    Clearance of lower knife group adjustment levers
    Maintenance of moving belt bearings and pistons under the blade
    Blade motion reducer motor maintenance bearing replacement
    Removal of moving knife side perno arm bearing gaps, new perno manufacturing
    If necessary, lifting the machine to the borwerk bench

The arrival of the machine from Kolsan

16/10/2024

Renovation Works

Bağlantı çubuklarının bronz yataklardan bilyalı yataklara dönüştürülmesi

Upper Group Renovation

Connection points of connecting rods in upper group renewed according to rolling bearing

Upper Group Bed Remodeling

From swallow bed to linear bed

Final

05.11.2024 delivery of the machine to Kolsan