Fischer machine revision

Specification

As a result of the machine inspection and the interview with the Kolsan technical team, a maintenance plan was prepared within the framework of the following items
  • Dismantling of the guillotine section of the existing machine and modification of the bearing group
  • Removing the construction in the region by placing a linear guideway and making removable fasteners
  • Side eccentric arm conversion from bronze to ball bearing
  • Supply and installation of special roller load bearings
  • Manufacture and assembly of bearing connection special design wedges
  • Modification and renewal of blade connection plate threads
  • Renewal of band bearings under the blade
  • Clearance of the lower knife group adjustment levers
  • Maintenance of moving belt bearings and pistons under the blade
  • Blade motion reducer motor maintenance bearing replacement
  • Removing the moving knife side perno arm bearing gaps, new perno manufacturing
  • If necessary, lifting the machine to the borwerk bench

Arrival of the machine from Kolsan

16/10/2024

Renovation Works

Conversion of connecting rods from bronze bearing to ball bearing

Upper Group Renovation

Connection points of connecting rods in upper group renewed according to rolling bearing

Upper Group Bed Renovation

Switched from swallow bed to linear bed

Final

05.11.2024 delivery of the machine to Kolsan