Specification
As a result of the machine inspection and the interview with the Kolsan technical team, a maintenance plan was prepared within the framework of the following items
- Dismantling of the guillotine section of the existing machine and modification of the bearing group
- Removing the construction in the region by placing a linear guideway and making removable fasteners
- Side eccentric arm conversion from bronze to ball bearing
- Supply and installation of special roller load bearings
- Manufacture and assembly of bearing connection special design wedges
- Modification and renewal of blade connection plate threads
- Renewal of band bearings under the blade
- Clearance of the lower knife group adjustment levers
- Maintenance of moving belt bearings and pistons under the blade
- Blade motion reducer motor maintenance bearing replacement
- Removing the moving knife side perno arm bearing gaps, new perno manufacturing
- If necessary, lifting the machine to the borwerk bench
Arrival of the machine from Kolsan
16/10/2024


Renovation Works
Conversion of connecting rods from bronze bearing to ball bearing



Upper Group Renovation
Connection points of connecting rods in upper group renewed according to rolling bearing


Upper Group Bed Renovation
Switched from swallow bed to linear bed


Final
05.11.2024 delivery of the machine to Kolsan